How Often Is Earthing Measurement Required?

An earthing measurement report is one of the first documents requested in an occupational safety audit. When should it be renewed and what makes a report valid?

Electrical installation inspection at a distribution board

Intervals by facility type

  • Industrial facilities and commercial centres: earthing resistance measured every year
  • Non-fixed installations: fixed equipment 1 year, movable equipment 6 months
  • Generation, transmission and distribution facilities: 2 years
  • Power transmission and distribution lines: 5 years
  • Facilities with flammable/explosive substances and wet environments: at most 1 year

Who may issue the report?

Only electrical engineers who are EMO members with an SMM certificate and earthing authorisation may measure and report. Reports by unauthorised persons are invalid in audits.

What a valid report contains

  • List of measured points and values
  • Calibration certificate of the instrument
  • The engineer's SMM, authorisation certificate and EKİPNET number
  • Conformity assessment and recommendations for non-conformities

Plan it with lightning protection and installation checks

Lightning protection earthing and the periodic electrical installation inspection are also annual. Combining all three in one visit reduces cost and downtime.

Earthing measurement with PF Endüstri

Our EMO-authorised engineers measure with calibrated instruments; our reports are valid with all institutions including TSE and in OHS audits. We serve Izmir, Manisa, Aydın and the whole of Turkey.

Your quote within 24 hours

Attach your single-line diagram or project and one of our engineers will call you.

Chat on WhatsApp
We only use essential cookies and anonymous statistics.
Details