TEDAŞ Approval and Acceptance Procedures

Before an electrical installation can be energised, its design must be approved and the installation accepted. Our experienced team manages the whole process on your behalf, from paperwork to on-site acceptance, so you can focus on your business.

Electrical drawings prepared for TEDAŞ approval

What we handle

  • Project approval applications (TEDAŞ / distribution company)
  • EMO approvals and documentation
  • Connection agreement and energisation permit processes
  • Site preparation and test reports before provisional acceptance
  • On-site acceptance with the committee and punch-list follow-up

Required documents

Required documents vary by installation type and regional directorate. We prepare your file in full according to the current lists of the relevant institutions, TEDAŞ Gediz Regional Directorate in particular, and share it with you before submission.

Faster acceptance with in-house testing

We prepare the earthing, insulation, protection relay and circuit-breaker test reports required at acceptance with our own calibrated instruments, so the process never waits on third parties. This is the key to keeping your energisation date on track.

Frequently asked questions

Which tests are required for TEDAŞ acceptance?

Depending on the installation: earthing measurement, insulation tests, protection relay and circuit-breaker tests and transformer tests. We carry them out and report them ourselves.

Which regions do you cover?

Izmir, Manisa and Aydın in particular, the Aegean region and the whole of Turkey.