Testing and Commissioning Services

Commissioning is the last and most critical step of a project. Incomplete or incorrect testing means protection systems may fail when a fault occurs. This is exactly where PF Endüstri specialises: site testing, reporting and safe energisation.

Testing and commissioning at an MV substation

What is testing and commissioning?

It is the procedure-based site testing and reporting of all equipment before energisation, bringing devices into operation and handing the system over. From site tests to energisation we work with calibrated primary and secondary injection test sets and certified engineers and technicians.

Air and gas-insulated MV switchgear

  • Panel function tests
  • Protection and control relay tests
  • Current and voltage transformer tests
  • Circuit-breaker checks and tests
  • Busbar insulation and joint contact resistance tests

Low-voltage switchboards

  • Panel function tests
  • Circuit-breaker checks and tests
  • Busbar insulation and contact resistance tests

Power and distribution transformers

  • Insulation resistance tests
  • Turns ratio (TTR) tests
  • Winding resistance tests
  • Transformer protection device tests (Buchholz, hermetic relay, thermometer)

MV and LV cables

  • Cable insulation resistance tests
  • Cable high-voltage withstand tests

Frequently asked questions

Why are commissioning tests important?

Correct protection operation during a fault, and therefore the safety of equipment and people, depends on them. Poor commissioning is the most common cause of long-term failures and downtime.

Can I use your test reports for TEDAŞ acceptance?

Yes. Our test reports are prepared for use in acceptance procedures.