What is testing and commissioning?
It is the procedure-based site testing and reporting of all equipment before energisation, bringing devices into operation and handing the system over. From site tests to energisation we work with calibrated primary and secondary injection test sets and certified engineers and technicians.
Air and gas-insulated MV switchgear
- Panel function tests
- Protection and control relay tests
- Current and voltage transformer tests
- Circuit-breaker checks and tests
- Busbar insulation and joint contact resistance tests
Low-voltage switchboards
- Panel function tests
- Circuit-breaker checks and tests
- Busbar insulation and contact resistance tests
Power and distribution transformers
- Insulation resistance tests
- Turns ratio (TTR) tests
- Winding resistance tests
- Transformer protection device tests (Buchholz, hermetic relay, thermometer)
MV and LV cables
- Cable insulation resistance tests
- Cable high-voltage withstand tests
Frequently asked questions
Why are commissioning tests important?
Correct protection operation during a fault, and therefore the safety of equipment and people, depends on them. Poor commissioning is the most common cause of long-term failures and downtime.
Can I use your test reports for TEDAŞ acceptance?
Yes. Our test reports are prepared for use in acceptance procedures.