Earthing Measurement and Reporting

Earthing is not a recommendation but a legal requirement. Correctly earthing the non-live metal parts of electrical equipment protects people and your facility. PF Endüstri measures with calibrated instruments and EMO earthing-authorised engineers, and issues reports accepted by every institution.

Technician measuring earthing at an electrical panel

What are earthing and earthing measurement?

Earthing is the connection of the non-live metal parts of electrical equipment, such as generators, transformers, motors, lighting poles and appliances, to the earth through a conductor. Earthing measurement is the technical verification that this connection meets the values set by EMO, TSE and international standards.

Who can issue an earthing report?

Under the Turkish Earthing Regulation, measurement, reporting and conformity assessment may only be carried out by electrical engineers who are EMO members with an SMM certificate and earthing authorisation. Our reports include our engineers' authorisation certificates, EKİPNET numbers, SMM and office registration documents and instrument calibration certificates, which is why they are valid with all institutions including TSE.

Inspection and measurement intervals

Non-fixed installations

  • Fixed operating equipment: 1 year
  • Movable operating equipment: 6 months

Commercial centres and industrial facilities

  • Earthing resistance inspection and measurement: 1 year
  • Other inspections and checks: 2 years

Fixed installations

  • Generation, transmission and distribution facilities: 2 years
  • Power transmission and distribution lines: 5 years

For facilities handling flammable, explosive or hazardous substances and for wet environments, the interval may not exceed 1 year.

Our measurement services

  • Facility and factory earthing measurement
  • Building and foundation earthing measurement
  • Lightning-protection earthing measurement
  • Soil resistivity measurement
  • Floor, equipment and machinery earthing measurement
  • Noise level, illuminance and thermal camera measurements

Frequently asked questions

How often should earthing be measured?

In commercial and industrial facilities, earthing resistance must be measured once a year; for hazardous-substance facilities and wet environments the interval may not exceed one year.

Where are your reports valid?

Prepared by EMO-authorised SMM engineers with all required certificates and calibration documents, our reports are valid with all institutions including TSE.

Do you travel outside Izmir?

Yes. We measure across the Aegean region, especially Izmir, Manisa and Aydın, and throughout Turkey.

Your quote within 24 hours

Attach your single-line diagram or project and one of our engineers will call you.

Chat on WhatsApp
We only use essential cookies and anonymous statistics.
Details